Sawston Unity Campus
CASE STUDYUnity Campus brings together pioneering individuals in purpose-built lab-enabled workspace, designed to foster innovation of all kinds. The campus is a starting point for new collaboration — both on campus and with the wider Cambridge community.
The Unity Campus had a sustainable approach at every level. From carbon conscious design practices driving building to energy efficient operational choices. The campus boasts 99% of construction waste diverted from landfill, all electric buildings with no fossil fuels and 130% biodiversity net gain.
Nicholson were very pleased to supply the Roofbox Riser Weathering system to Morgan Sindall for blocks A1, A2 and B of the new £100 million technology and R&D campus in Sawston, South Cambridge.
Location
Sawston
Architect
Main Contractor
MEP Engineer
Products Used
roof cabinets
The ROOFBOX® weathering system for service penetrations provides a proprietary and guaranteed solution to the inherent problems associated with bringing pipes, cables and ducts through the waterproofing layer at roof level. These insulated aluminium units are powder coated and provide an alternative to the traditional ‘dog kennel’ approach to weathering services as they exit onto the roof.